Back to Collection
Internal workshop · 60 minutes

Claude in BIM & Construction

Not a course about AI. A build-out of four layers of tooling that run on your own documents and models — from the first chat to Claude driving Revit.

Open the deck
04
Capability layers
06
Chapters · A–F
25
Sections
60′
Session length
A

Opening

Why generic AI fails in AEC, and what has to be true for it not to.

04 sections
A-01The problemA · Opening

You are not using it badly. The tool has no idea what you're working on.

The familiar story

You ask AI to write a design statement, or to summarise a spec clause. Back comes something that sounds thoroughly professional and misses the point. Fixing it takes longer than writing it yourself. So you go back to the old way.

The real cause

Generic AI does not know what "basis of design" means, does not know your firm's document standards, and does not know that in this industry "code review" means checking against building regulations, not checking software.

  • No context — it cannot read your project documents.
  • No standards — it does not know your in-house rules, so you re-explain them every single time.
  • No hands — it cannot touch the model, the folders, or the tools you actually work in.
Presenter notes

The "code review" example earns its keep: to generic AI, code means software. To us, code means building regulations. That gap is the whole difference between a generic tool and one with context.

A-02The core messageA · Opening

Automation is the tool's job. Yours is building the flow.

Most failures in bringing AI into AEC are not caused by a weak model. They are caused by information and models that were never put in order. When files are named on a whim, parameters differ from person to person, and the process lives in a few people's heads — no tool can save you.

01 · Base
Information management: documents, versions, naming, storage
02 · Base
Model management: templates, parameters, modelling rules
03 · Flow
A working process that is clear enough to write down
04 · Result
Automation happens, and cost drops sharply

Step 4 is not a target to strain towards. It arrives on its own once the first three are clean. Your years of expertise are not replaced — they are multiplied.

Presenter notes

This is the most important part of the session. If people remember one thing, let it be this. Slow down here.

A-03The map · Four capability layersA · Opening

From a chat window to a system running in the background

  1. 01Claude.ai — ConversationProducing real deliverables. This is where most people get stuck, because they use AI like a search bar.
  2. 02Projects — The project brainLoad in documents, specs, standards, meeting minutes. Claude stops being a chatbot and starts behaving like a colleague who has read the whole file.
  3. 03Skills — Company standardsPackage your in-house rules into something Claude follows by itself. No more repeating them in every conversation.
  4. 04MCP & Cowork — HandsClaude reaches into Revit, Drive and Notion; runs on a schedule and watches continuously. Repetitive work starts doing itself.
Presenter notes

Most people stand on layer 1 and assume that is all AI is. Today we walk all four.

A-04How today runsA · Opening

Each layer: 10 minutes to understand, 8 minutes hands-on

  1. 00:00Opening & the underlying ideaWhy generic AI fails, and what has to be true for it not to
  2. 00:08Layer 1 · Structured conversationExercise 1 — write a design statement for a real project of yours
  3. 00:22Layer 2 · The project brainExercise 2 — build a Project and cross-question the spec
  4. 00:36Layer 3 · A standards SkillExercise 3 — write a Skill that checks submittals against team rules
  5. 00:48Layer 4 · MCP & RevitLive demo, no exercise
  6. 00:56Rollout & questionsPick the first process to do for real this month

What you need: a Claude Pro account and a real project chosen in advance. Every exercise runs on real documents — no made-up examples.

Presenter notes

Remind everyone to have Claude open and to pick a real project before we start. Nobody just watches.

B
Layer 1

Conversation

Getting usable output on the first pass, instead of a generic draft you have to rewrite.

06 sections
B-01PositioningB · Conversation

What Claude is — and what it is not

  • A colleague who reads fastIt holds long context — a whole spec, an email chain, a set of minutes — and answers with reference to what is in them.
  • A drafterDesign statements, emails, reports, RFI responses — it gets you to 70% so you can spend your attention on the 30% that needs expertise.
  • A tool you can programThrough Projects, Skills and MCP it becomes part of the process, not a tab you open when you happen to remember.
  • Not a source for code lookupsClause numbers and figures from standards: always check them against the original document.
  • Not the party held responsibleThe signature is still yours. It drafts, you approve.
  • Not a search barAsk a one-liner, get a generic one-liner. This is the most common mistake.
Presenter notes

Do not get drawn into explaining how an LLM works. People only need to grasp this: it reads long text and holds the thread, so it suits document-heavy work.

B-02Prompt frame · Five partsB · Conversation

The shape of a request that produces work

Role
Who you are in this set of documents
Context
Project, stage, who the reader is
Input
Documents, figures, real constraints
Constraints
Standards, tone, what is off limits
Output
Format, length, section structure
One line · five parts
# Instead of:
"Write me a design statement for an office building."

# Write:
Role: lead architect, writing for the basic design submission.
Context: 12-storey office, new urban district, private developer,
        the reader is the appraisal board.
Input: [paste the area schedule + 5 bullet points on the concept]
Constraints: Vietnamese submission register, no marketing adjectives,
        do not infer figures beyond the input.
Output: 4 sections — overview, spatial organisation, façade
        strategy, technical strategy. 150–200 words each.
Presenter notes

This is the frame people will use all session. Tell them to save it.

B-03Application 1B · Conversation

The design statement

One-line prompt

Out comes fluent, grammatical prose that would fit any other project just as well. Nothing specific to yours is in it. You rewrite from scratch.

Five-part prompt

Out comes a draft that tracks the figures you supplied, in the register of the submission, with the number of sections you have to hand in. You correct the technical detail and add what only you know. Roughly 30% of the work is left.

  • Key trick — ask Claude to mark exactly where it is inferring, rather than letting it invent smoothly.
  • Second trick — give it an old design statement that met the team standard as a tone sample. It works better than any description in words.
Presenter notes

If there is time, run both prompts live so people see the difference on screen.

B-04Application 2B · Conversation

Scoping the work & estimating effort

Give Claude the tender request or the client's scope of work, describe how your team normally delivers, then ask it to break the job down into package — stage — role — estimated hours.

0%
Old way · starting from a blank page
70%
New way · starting from a structured draft
30%
What remains · exactly where your expertise is needed
  • Make it list the assumptions it used at the bottom of the table — that is the fastest place to check its work.
  • Make it flag the packages most often missed, compared with similar documents you have loaded into the Project.
Presenter notes

70% is not "nearly finished". It is "no longer a blank page". That is where the value is.

B-05LimitsB · Conversation

Where Claude goes wrong — and how to block it

  • Inventing figures and clausesEspecially standard numbers, build-up thicknesses, coefficients. It sounds completely certain.
  • Reasoning past the documentsWhere data is missing, it fills the gap with something generically plausible.
  • Agreeing with youAsk a leading question and it will happily confirm what you wanted to hear.
  • Pin it to sources"Use only the information in the attached documents. Where it is missing, write MISSING DATA."
  • Demand citationsRequire the section or page reference for every claim.
  • Turn the question around"Give me three weaknesses in the argument above" — a cheap, fast cross-check.

Team rule: every figure that reaches a submission is checked by a person against the original document. Claude drafts, a person signs.

Presenter notes

Do not skip this. People need to see you being honest about the limits before they will trust the rest.

B-06Exercise 1 · 8 minutesB · Conversation

Rewrite one of your own prompts

The brief
Take something you actually have to do this week

Pick a real writing task: a design statement, a progress email, an RFI response, or meeting minutes. Write the prompt with all five parts. Run it. Then change one part of the prompt and run it again, to see which part moves the result most.

  • Keep the prompts that worked — at the end we collect them into a shared team library.
  • If the result is still generic, it is almost certainly the Input part that is missing, not the Role part.
Presenter notes

Time the 8 minutes properly. Walk the room and look at screens. Pick one or two people to share.

C
Layer 2

The project brain

Context stops being something you retype. It lives inside the project.

04 sections
C-01The problemC · Projects

Context dies at the end of every conversation

At layer 1, every new window means pasting the spec again, naming the project again, explaining who the client is again. Context never accumulates. That is why AI stays stuck at "assistant that writes emails".

Without a Project

Every question is a fresh start. You become a manual courier moving documents between a folder and a chat box.

With a Project

The documents are already inside. Ask "what does the basement floor finishes section say about waterproofing" and get an answer with its location, in seconds.

Presenter notes

Question for the room: how long does it take a new joiner to get on top of a live project? That is exactly the cost a Project removes.

C-02What goes inC · Projects

What to load into a Project

  • Project documentsDesign statement, spec, area schedule, drawing register
  • In-house standardsNaming rules, document templates, the team handover checklist
  • CorrespondenceMeeting minutes, answered RFIs, client instructions
  • Model dataSchedules exported from Revit, family registers, clash reports
Project-specific instructions
Always answer in Vietnamese, in submission register.
Every claim must cite the document name and section.
Do not speculate beyond the loaded documents —
where data is missing, write MISSING DATA.
Use metric units; levels are given against
finished floor level 1 = ±0.000.

Precondition: documents must be clearly named, versioned, and actually the latest issue. Load a messy folder and you get messy answers — just faster.

Presenter notes

Project quality equals folder quality. This is the bridge back to the core message in A-02.

C-03ApplicationsC · Projects

Four things a Project already does well today

  • Cross-checking drawings – statement – spec"List every place where the design statement describes a material differently from the corresponding spec section." This is the most expensive class of error and the hardest to catch by eye.
  • Answering RFIsGive it the question; Claude finds the basis in the documents and drafts a response with citations for you to check.
  • Pre-meeting briefs"Summarise every open issue with the MEP contractor from the last three sets of minutes, with who owns each one."
  • A ready set of email templatesProgress reports, declining out-of-scope requests, deadline reminders — written once, used for the whole project.
Presenter notes

These four eat more of a project lead's time than anything else. Ask the room what else belongs here.

C-04Exercise 2 · 8 minutesC · Projects

Build a Project for the job you are running now

The brief
Load 3 documents, ask 1 hard question

Create a new Project. Load: one spec section, one part of a design statement, and the most recent set of meeting minutes. Write the Project instructions. Then ask a question that would normally take three open files to answer.

  • A good test question: "Is there any contradiction between these three documents?"
  • If Claude answers wrongly, check whether what you loaded is really the latest issue. That is usually where the fault is.
Presenter notes

8 minutes. If anyone has no documents to hand, give them the prepared sample project.

D
Layer 3

Skills

Your team standard, packaged once, followed by Claude from then on.

04 sections
D-01The ideaD · Skills

A Project is what it knows. A Skill is how it works.

After a few weeks with Projects you will notice yourself typing the same instructions over and over: this format, check against that checklist, avoid that phrasing. A Skill is where you write it down once.

Prompt

Used once. Lives in your head or in a notes file. Nobody else can use it.

Project

Context for one job. When the job ends, so does its value.

Skill

A procedure belonging to the team, tied to no particular job. It activates itself on the right kind of work. It can be handed to someone else as is. This is the thing that compounds over time.

Presenter notes

A good metaphor: the Project is the filing cabinet. The Skill is the procedure pinned to the workshop wall.

D-02What it containsD · Skills

What a Skill is made of

01
Trigger descriptionWhen Claude should reach for this Skill
02
InstructionsThe steps to take, in order
03
Reference materialTeam checklists, templates, conversion tables
04
Scripts (if needed)Code that processes files or exports reports
Example trigger description — the part that matters most
Use this Skill when a contractor submittal needs checking
(shop drawings, material schedules, method statements) against
a spec or a team standard. It also triggers when the user says
"give this a check", "review this document", "anything wrong here".

Do not use it when the request is only to summarise a document,
with nothing to check it against.
Presenter notes

Push hard on the trigger description: write it badly and the Skill never runs. This is the number one mistake for first-time authors.

D-03ExampleD · Skills

The "compare" Skill: what should be true vs what was submitted

The principle is surprisingly simple: give Claude the reference document (spec, team standard, checklist) and the thing to be checked (contractor submittal, drawing, schedule), then make it produce a structured discrepancy table you can correct and send on.

  1. Step 1Read the reference and extract a list of checkable requirements
  2. Step 2Go through the submittal requirement by requirement
  3. Step 3Output a table: Requirement · Submitted · Verdict · Citation
  4. Step 4Flag missing data separately — never guess

Other Skills worth building early: naming normalisation to team rules, meeting minutes in the correct template, drawing register checks before issue.

Presenter notes

The compare Skill is the one every BIM team should build first — it is both the easiest to write and the biggest saving.

D-04Exercise 3 · 8 minutesD · Skills

Write your team's first Skill

The brief
Pick the thing you explain most often

What do you find yourself explaining to new joiners over and over? That is your first Skill. Write three parts: when to use it, the steps, and what the output looks like.

  • Trick: open an old conversation whose result you were happy with, and ask Claude to write the Skill from that conversation.
  • A good Skill is one someone else can use without asking you. That is the acceptance test.
Presenter notes

8 minutes. It does not have to be finished — the trigger description and three steps are enough.

E
Layer 4

MCP & Cowork

From talking about the model to touching the model.

05 sections
E-01The ideaE · MCP & Cowork

MCP — a standard socket between Claude and real tools

Claude
Reads the request, plans, calls the right tool
MCP Server
The layer in between, exposing the commands the software permits
Revit · Drive · Notion
The model, the document folders, the project database
  • Before MCP — you are the courier. Export from Revit, paste into Claude, copy the result back, retype it into the model.
  • After MCP — Claude reads and acts directly — strictly within the commands you allow.
Presenter notes

Explain MCP with the standard-socket metaphor: one common standard for Claude to plug into other software, instead of a bespoke route for each one.

E-02Live demoE · MCP & Cowork

Claude driving Revit

  • MassingFrom a written area brief to volumes and floor stacking in the model
  • Structural layoutColumn grids and beams following the agreed spans and rules
  • Documents & schedulesCreate sheets, place views, export schedules in the team template
  • Data auditFind objects with missing parameters, wrong names, wrong classification
The toolkit behind the demo

The demo runs on the T3Lab add-in for Revit itself: the same commands the team uses every day, except that the one calling them is Claude.

The panel and tool reference lives in the Revit area of this site.

See the T3Lab toolkit
Presenter notes

LIVE DEMO. Have the Revit file open and T3Lab already connected. Keep a screen recording as backup in case the network drops.

E-03PreconditionsE · MCP & Cowork

MCP only helps when the model has discipline

This is where everything returns to the message we opened with. Claude acts on the model through names, parameters and rules. If those three are arbitrary, the results will be arbitrary too — only faster.

  • One naming conventionFamilies, types, views, sheets — one convention, followed by the whole team
  • A standard parameter setShared parameters with clear definitions, not a different scheme per project
  • Clean templatesNo debris accumulated across generations of projects
  • A process you can write downIf you cannot describe it in words yet, you cannot automate it yet

Put differently: investing in BIM standardisation is investing in AI. They are the same job.

Presenter notes

This ties back to the core message. Say it plainly: MCP cannot save a dirty model.

E-04CoworkE · MCP & Cowork

From "runs when you open it" to "already running"

On a schedule

Every morning, a short briefing pulled together from the calendar, email and project sources: what meetings are today, who is waiting on you, what deadlines are coming.

Continuously

Watch new activity on the project and turn it into concrete work: draft responses, version comparison tables, proposed next steps.

  • Repetitive work starts doing itself — but the output is still a draft, and a person still approves it.
  • Start with exactly one process. Run it for a month before you add a second.
Presenter notes

Cowork is the background layer. If you are not using it yet, present it as a direction, not a promise.

E-05Safety & accountabilityE · MCP & Cowork

The boundaries have to be agreed before you scale

  • Client dataWhich contracts forbid putting documents on third-party services? Check first, not afterwards.
  • Write access to the modelRun on a copy first. Never let a tool write straight into the issued model.
  • Document accountabilityThere is no such thing as "the AI got it wrong". The person who signs is accountable, as with any other drawing.
  • The minimum rules worth publishingA list of data allowed to leave the office · a mandatory human check before issue · a record of where AI took part in a submission
Presenter notes

Do not skip this when presenting to management — it is the part they care most about.

F
Closing

Rollout

From this workshop to something genuinely running in the team.

02 sections
F-01Personal track · 8 weeksF · Rollout

One tool a week, used that same week

  1. Week 1Prompts that produce workWrite one complete design statement and understand why it worked
  2. Week 2Scoping & estimatingApply it to a real tender document
  3. Week 3The project brainBuild a Project and check one spec section
  4. Week 4The communication kitClient emails, RFI responses, meeting briefs, progress reports
  5. Week 5The compare SkillAutomate the first review pass on submittals
  6. Week 6The morning briefingRuns on a schedule, ready before you open the laptop
  7. Week 7Continuous watchingSpot new work and sort it into actionable output
  8. Week 8Hand it to a colleaguePackage one process so someone with no AI experience can still use it
Presenter notes

One thing a week, applied to real work immediately. No cramming.

F-02Team trackF · Rollout

Pick exactly one painful process — and finish it

  • ChooseThe process that costs the most hours and repeats most reliably. Not the flashiest one.
  • StandardiseWrite that process down in words. If you cannot write it, you cannot automate it.
  • PackageInto a Project plus a Skill, trialled on a live job.
  • SpreadOne person uses it well first, then replicate. Do not train the whole team at once.
How to measure it

Hours saved per run of that process — measured before and after.

Errors caught early during review, instead of surfacing on site.

Time for a new joiner to get on top of the documents — the number that says the most about the quality of your information management.

Presenter notes

Leave a few minutes here for the team to pick their most painful process. Write it on the board.

Closing

The tool handles the repetition. You handle the judgement.

The difference is not in knowing more about AI. It is in how many systems you have actually running, on real documents — built by you.

This week · pick 1 processShared prompt library · send to the BIM teamQuestions