T3LAB.REVIT/Modeling & Datum/DatumSync

DatumSync

Datum Sync

Syncs the 2D geometry, bubble head visibility and elbows/leaders of Grids and Levels from the active View to a batch of target Views.

Ribbon:Modeling & Datum
Safety:Atomic Transaction
Revit:2020 – 2026

Interactive Demo

Live demo · UI from XAML
RAutodesk Revit 2025 - Snowdon Towers.rvt - Floor Plan: Level 1
FileArchitectureStructureSteelPrecastSystemsInsertAnnotateAnalyzeMassing & SiteCollaborateViewManageAdd-InsT3LabModify
Support
Standards & Families
Model & Datum
Rebar & Assembly
Annotation & Data
Views & Sheets
Properties
Floor Plan
View Scale1 : 100
Detail LevelMedium
DisciplineArchitectural
View Template<None>
Project Browser - Snowdon Towers.rvt
[-] Views (all)
[-] Floor Plans
Level 1
Level 2
Roof
[-] Ceiling Plans
Level 1
[-] 3D Views
{3D}
[-] Elevations
North
South
[+] Drafting Views
[-] Schedules/Quantities
Room Schedule
[-] Sheets (all)
A001 - Cover
[+] Families
[+] Groups
[+] Revit Links
Level 1 ×
ABCD123OFFICE101MEETING102CORRIDOR103OFFICE104LOBBY105WC106
1 : 100▣☼
Click to select, TAB for alternates, CTRL adds, SHIFT unselects.Main Model
⤢ Full screenSimulated Revit window. Click anywhere to try it yourself.

Detailed Documentation

DatumSync — 2D Grids & Levels Synchronizer

DatumSync synchronizes the 2D display of Grids and Levels in Revit. It quickly copies 2D extent lengths, grid bubble visibility (Bubble) and elbows (Elbow/Leader) to many other views.


1. Key Features

  • 2D Extents only: Never changes the real 3D coordinates of the building, so your BIM data stays safe.
  • Bubble & Leader sync: Keeps which end shows the bubble, and whether an elbow is added to avoid overlapping text.
  • Grids and Levels: Works in plans (Floor/Ceiling Plans) as well as elevations and sections (Elevations/Sections).
  • Smart filtering: Easily select groups of views by discipline or by level to sync.

2. How to Use

  1. Step 1: Open the source view where the grid ends and bubbles are already fully adjusted.
  2. Step 2: Click Datum Sync on the Modeling & Datum panel.
  3. Step 3: Choose what to sync:
    • Grids (grid system).
    • Levels (level system).
  4. Step 4: Check the target views that should receive the 2D formatting.
  5. Step 5: Click Synchronize to finish.

3. Tips & Best Practices

[!TIP]

  • Run DatumSync once the drawing presentation standards are agreed, at the design development / construction documents stage (DD/CD).
AutoJoin →